For new energy, battery cell, PV and lithium battery workshops, Legoway dual fiber epoxy coil flooring helps solve the combined floor requirements of cleanliness, high wear resistance, dust control, anti-static performance and efficient installation. The company has 11 in-house production lines and 7 million m² annual delivery capacity, with products approved by BYD, CATL, BOE and other leading enterprises.
The customer is not simply buying a floor material. They need a flooring system that supports long-term production stability, backed by reliable manufacturing capacity and enterprise-level approval experience.
| Workshop Problem | Common Risk | Solution Direction |
|---|---|---|
| Dust and cleaning pressure | Worn floor surfaces may generate dust and become harder to clean. | Dense and easy-to-clean surface design for cleaner production environments. |
| Frequent AGV or cart traffic | Fixed routes may show scratches, wear marks or local damage. | Dual-fiber reinforced epoxy coil structure for demanding industrial traffic. |
| Anti-static and cleanroom needs | Electronic and new energy workshops may be sensitive to dust and static electricity. | Functional configurations can be selected based on project requirements. |
| Renovation schedule | Old workshop upgrades may affect production if the process is too slow. | Coil flooring supports standardized installation and shorter construction cycles. |
| Long-term maintenance | Low initial cost may lead to higher future repair and downtime cost. | Flooring zones can be designed according to workshop function and traffic intensity. |
For clean, dust-controlled and high-wear production areas and logistics lanes.
For PV cell, module, packaging, warehouse and AGV route areas.
For cathode, anode, logistics and storage areas with different flooring requirements.
For production spaces that need easy cleaning, reduced dust and a tidy visual appearance.
For high-frequency vehicle routes requiring wear resistance and stable maintenance cycles.
For projects that need shorter installation cycles and reduced production interruption.
For tender or design specification, prepare test reports, samples, case photos and technical data sheets whenever possible.
The floor is part of the production environment. It affects cleaning, dust control, traffic durability and maintenance cost.
Ordinary epoxy flooring often depends heavily on site coating conditions. Dual fiber epoxy coil flooring focuses on standardized material structure, reinforced performance and efficient installation.
Yes. The final proposal should be based on the existing substrate, production shutdown window, traffic intensity and functional requirements.
Send us your workshop area, site photos, traffic conditions and special requirements. Legoway can help with preliminary flooring selection.
Jiangsu Legoway New Materials Technology Co., Ltd. · Dual Fiber Epoxy Coil Manufacturer · 11 in-house production lines · 7 million m² annual delivery capacity